Shot blasting machine maintenance

Crawler shot blasting machine maintenance

1 every day after work should be cleaned again.  

2. Should always check cleaning chamber of the support board and the blasting directional set, round pills and wear, if wear serious, should be replaced immediately.  

3. The machine before operation, where there is movement of the spirit of the parts need lubricating, shot blasting machine spindle bearing, every week 2 # calcium base grease a times. The spiral conveyor, lifting bearing machine, monthly 2 # calcium base grease at a time. The rest of the bearing every 3~6 months plus a # calcium base grease. And other parts of the chain once a week to add a mechanical oil, motor lubrication requirements on schedule. 4 regularly check the transmission parts, cleaning parts, replacement of worn parts. 5 machines in the maintenance inspection, the power must be cut off, to prevent accidents.  

6 the machine works 48 hours to deal with the wind turbine, and the removal of dirt attached to the wheel, in order to ensure the smooth running of the fan and the service life.  

7 cleaning room of the guard board can be replaced according to the circumstances, the replacement should be the protection of the plate parts of the installation gap control within the 1.5mm, when the reference schematic.  

8 Track replacement: the front door open, remove all the interference parts, with 10# steel bar to do four bending hook from the upper part of the body of the craft hole will drive shaft and track suspension, the track from the door tilt.